Salta al contenuto principale
Passa alla visualizzazione normale.

Ricerca avanzata per:

Risultati della ricerca

  • 1. REP. 202_2023 - Grant_Agreement_Core_Blue4all_Sarà (100%)

    10-gen-2024 9.04.29

    starting date – whichever is the latest 1 1 18 Periodic report 60 days after end Interim payment 90 days from of reporting period receiving periodic report 2 19 36 Periodic report 60 days after end Interim ... to beneficiaries that have acceded. Interim payment ceiling (if any): 90% of the maximum grant amount

  • 2. REP. 797_2023 - Grant Agreement-101083460-WIMBY (100%)

    10-gen-2024 9.04.34

    date – whichever is the latest 1 1 18 Periodic report 60 days after end Interim payment 90 days ... to the Agreement and only to beneficiaries that have acceded. Interim payment ceiling (if any): 90

  • 3. 2022_REP_44-engage4bio_ca_FINAL_Signatures_complete (68%)

    10-ott-2023 13.15.17

    ) and interim payments to Parties will be handled in accordance with Article 22.1. and Article 7 ... Internal interim reporting no payment M18 Financial reporting (cost statement) and report of WPs ... Interim payment (20%) after the Coordinator received the 2nd instalment from the EC M27 Internal interim reporting No payment M36 Final reporting (Final cost statement and Final report ... schedule •For each interim payment the Coordinator shall assess the expenses reported by the Parties

  • 4. 2022_REP_10 - AMP ISOLE EGADI - AMPIE (52%)

    10-ott-2023 13.15.10

    (primo interim report) al mese 6 (settembre 2022); b) una relazione finale a seguito dello svolgimento ... verifiche amministrative della prima relazione delle attività (primo interim report) e relativi

  • 5. 2022_REP_10 - Allegato tecnico BOSE_AMPIE signed (1) (48%)

    10-ott-2023 13.15.10

    con le seguenti modalità: - 50% alla consegna del I interim report previsto al mese 6 (settembre

  • 6. Agarwal (44%)

    15-mar-2024 12.48.00

    increase with bent sources. Stage 3 is an interim period, when age. Audretsch (1991) studies 11,000

  • 7. REP. 2482_2023- Capsenhar_subsidy contract-2 -Sarà (41%)

    10-gen-2024 9.04.30

    . 03/2023 has been ratified s) Decreto del Dirigente Generale ad interim del Dipartimento regionale